ERP Selection Criteria Checklist

ERP Selection Criteria Checklist for Manufacturers: 8-Category Scorecard

Score every platform on your shortlist before the demos begin.

Rate each criterion 1 (not met), 2 (partially met) or 3 (fully met). Weight each category by your operational priority. The weighted total determines which platform advances to the demo shortlist.

Request the Fillable Version
How to Use It

How to Use This Checklist

Use this checklist to score each ERP platform on your shortlist before vendor demos begin. The point is not to collect vendor self-scores. It is to have a documented basis for checking them.

Printable and Excel-fillable version

For a printable and Excel-fillable version of this checklist, contact GrayCyan.

01

Complete the checklist for your operation first

Mark each criterion as required (R), preferred (P), or not applicable (N/A).

02

Send the checklist to each vendor on your longlist

Ask them to self-score and provide evidence for each criterion.

03

Verify vendor self-scores during demos

Use the demo tests below to check each criterion claim rather than accepting the self-score.

04

Weight each category by your operational priority

Compliance carries more weight for regulated manufacturers. AI readiness carries more weight for manufacturers planning AI deployment in the next 18 months.

05

Compare weighted totals

The platform with the highest weighted score against your specific requirements advances.

The Eight Categories

ERP Selection Criteria: The Eight Categories to Score

Each category below lists the criteria to score and, where the scoring is easy to get wrong, the test that settles it. Open a card to see the full criterion list.

Scorecard

Scoring Summary Table

Score each platform 1 to 3 per category, multiply by the category weight, and compare weighted totals.

CategoryWeightPlatform APlatform BPlatform C
1. Manufacturing Module Depth25%__ /3__ /3__ /3
2. Inventory & Warehouse Management20%__ /3__ /3__ /3
3. Compliance Documentation25%__ /3__ /3__ /3
4. Financial & Cost Accounting15%__ /3__ /3__ /3
5. Integration Architecture15%__ /3__ /3__ /3
6. AI Integration Readiness15%__ /3__ /3__ /3
7. Implementation Partner Ecosystem10%__ /3__ /3__ /3
8. Total 3-Year Cost of Ownership10%__ /3__ /3__ /3
WEIGHTED TOTAL100%______

Weight adjustment

The figures above are defaults. Set them to your own operational priorities and normalise the set to 100 before scoring begins, because the weighting is what makes the totals comparable across platforms.

Regulated manufacturers should increase Category 3 (Compliance) and reduce Category 4 accordingly. Operations planning AI in the next 18 months should increase Category 6 (AI Readiness) and reduce another category by the same amount. Total weights must always sum to 100%.

Watch These Three

Three Criteria That Are Harder to Score Than They Look

These three are where vendor self-scores and verified scores diverge most often. Each one has a specific demo test that settles it.

01

Compliance documentation

Category 3

Vendors universally claim compliance capability. The real test is whether compliance documentation is generated at the scan event or assembled manually afterward.

In the demo, ask: “Show me how an FSMA 204-compliant receiving record is generated when I scan a receiving barcode.” If the answer involves navigating to a separate screen after the scan, score 2.

02

AI integration readiness

Category 6

Most ERP vendors cannot demonstrate live API write-back in a demo. They will show screenshots or documentation instead.

Require a live API demonstration: a Python script reading inventory data from the ERP and writing a reorder point update back. If they cannot do this in the demo, they cannot support real-time AI integration in production.

03

Implementation partner reference quality

Category 7

A reference from a manufacturer still in implementation is not a reference. A reference from a manufacturer in a different vertical is not applicable.

Require a reference that is post go-live, in the same industry, and with the same compliance requirements. Ask the reference: “What went wrong, and what would you scope differently?”

Let's
Talk

Ready to Score Platforms? GrayCyan Can Help With the Hard Parts.

Filling in this checklist is the easy part. Verifying vendor claims in demos, checking references from your industry, modelling the honest three-year total cost, and identifying compliance gaps before the implementation contract is signed: that is where GrayCyan's ERP consulting adds value.

See the full ERP selection guide or independent ERP selection consulting →